More than 10,000 gallons of sealer and over a dozen new asphalt speed bumps, run in five phases so residents kept their parking throughout.

Property

Farmstead Apartments
360 units, Multifamily residential

Client

Table Rock Property Management
Repeat customer

Total Area

About 500,000 sq ft

Schedule

5 phases of about 100,000 sq ft each

Sealer Sprayed

More than 10,000 gallons

Speed Bumps

More than a dozen, new asphalt

The logistics of a 360-unit complex

A 360-unit complex cannot lose its parking. Residents have to leave for work in the morning and come home at night, and a lot that is closed for a week generates more complaints than the cracked pavement ever did. That is why large properties get quoted, then postponed, then quoted again the following year.

Splitting the site into five phases of roughly 100,000 square feet each is how it gets done. A section works while the other cures, then they swap. Sealer needs to be kept off for a set time before traffic goes back on it, which is what makes the phasing a scheduling problem rather than a simple matter of working faster.

We build the schedule around strict cure times: foot traffic at about two hours, vehicle traffic at twelve hours, and twenty-four hours to keep the warranty intact.

Nobody lost their parking spot. That is usually the part a property manager is actually worried about.

Asphalt speed bumps

Installing more than a dozen new asphalt speed bumps was a distinct line item on this job. It is a common request at apartment complexes and has a clear safety rationale a manager can take to ownership.

If your property is large enough that you have been putting this off, phasing is how it gets done.

We will walk it and build the schedule with you.