Nampa Parking Lot Striping
Parking lot striping in Nampa, Idaho
Laid out around your hours, dry in about twenty minutes, and marked to the requirements that actually apply here.
Nampa requires your lot to be striped
Most owners treat faded lines as something to get to eventually. Nampa city code, title 10 chapter 22, requires that parking spaces in the city be striped, and defines required maintenance to include repair of parking, loading and drive aisle surfaces.
The same chapter sets minimum drive widths: two-way service and access drives at least twenty feet, one-way at least twelve (Nampa City Code 10-22-3).
Accessible spaces do not count toward your minimum. Section 10-22-6 states that ADA spaces are installed in addition to the required parking count. If your lot was laid out assuming they counted, you are short.

Restriping, or building a new layout
The first question is your operating hours. The second is this one, and it is what sets the price.
Restriping means repainting the layout that already exists. That is the baseline.
A new layout means establishing square reference points and building the layout off buildings, sidewalks, curbing or whatever fixed structures the site gives us. It runs about twice as long.
When a lot has been restriped so many times that the old markings have become confusing, we may recommend sealcoating it and laying out fresh rather than adding another layer of paint over the confusion.

What the ADA actually requires
This is where most lots go wrong, and where most contractors will tell you whatever the previous striping said.
| Car space width | 96 inches minimum (ADA 502.2) |
|---|---|
| Van space width | 132 inches minimum, or 96 inches where the access aisle is 96 inches (ADA 502.2) |
| Access aisle width | 60 inches minimum (ADA 502.3.1) |
| Access aisle length | The full length of the space it serves (ADA 502.3.2) |
| Shared aisle | Two spaces may share one access aisle (ADA 502.3) |
| Sign height | Bottom of the sign at least 60 inches above the ground (ADA 502.6) |
The Van Space Rule
One van space for every six, or fraction of six, required accessible spaces. Not one per six total spaces. A hundred space lot needs four accessible spaces and one of them van accessible.
No Painted Symbol Required
The ADA requires a mounted sign and does not require a symbol painted on the pavement at all. We paint it because customers and inspectors expect it, not because a code section says so.
Idaho Code 39-4116
Idaho Code 39-4116 does not allow a city to amend any accessibility provision. Accessible parking requirements are exactly the same in Nampa as they are in Meridian, Boise or Eagle.
How the work runs
A striping crew is two to three people. On larger jobs both striping machines run, which turns a big layout into one visit instead of two.
Measure and mark the positions for all parking stalls across the lot.
Snap chalk lines to ensure every stripe is perfectly straight and aligned.
Paint the accessible space symbols and markings. Compliance work goes in before standard stalls to drive the layout.
Apply oil-based Sherwin-Williams SETFAST traffic paint. Dry to the touch in about 15-20 minutes.
Finish speed bumps, arrows, curbing, numbering, lettering and any other stencil work.
Everything besides the stalls
When the stall is fine but the sidewalk is not
Fully noncompliant stalls are uncommon. The more common problem is that the stall and the access aisle measure fine, and the sidewalk or curb ramp beside them does not comply and needs to be removed and replaced.
When we see it, it goes in the estimate, you get told the existing condition may not comply, and if you want it corrected, we quote that separately. We are not going to stripe around a problem and let you find out from an inspector.
Numbering, Arrows & Stencils
Numbered stalls, directional arrows, speed bump markings, curb painting. Wheel stop installation. Custom lettering and wording at roughly 6, 12, 24 and 36 inch sizes.
Numbering is priced per character, moving with size, count, repetitions, and layout complexity. It's the best way to make assigned parking enforceable in apartment complexes.
A note on curb color
Curb color is not uniform across the valley, and the International Fire Code itself does not specify one. Nampa's parking ordinance refers to yellow painted curbs.
Before we mark a fire lane, we confirm the requirement with the local fire authority rather than painting whatever the last contractor painted.
What it costs
Striping is priced by the lineal foot, and runs about $0.35 per foot in most cases.
The number moves with lot size, layout complexity, how many stencils are involved, and how much curb, arrow and lettering work there is. We walk the lot, count what is actually there, and give you a written number before anything starts.
Lots we have striped
The Farmstead Apartments, Nampa
About 500,000 square feet of asphalt run in five phases, striped as part of the job, along with more than a dozen new asphalt speed bumps. Repeat customer, Table Rock Property Management.
View the project →Caldwell First Baptist Church
Parking lot sealcoated and re-striped, restoring the lot with clean lines and a clearer layout for the people using it.
View the project →Heron Village Apartments, Meridian
More than 150 numbered stalls and about 5,000 linear feet of red curbing across roughly 73,850 square feet.
View the project →Questions we get
How much does parking lot striping cost in Nampa?
About $0.35 per lineal foot in most cases. The number moves with lot size, layout complexity, stencil count and how much curb and arrow work is involved. A restripe of an existing layout costs less than building a new one.
How long does the lot have to stay closed?
The paint is dry to the touch in about fifteen to twenty minutes. The layout is what takes time, not the drying, which is why we schedule around your hours and work in sections where the layout allows.
Does Nampa require my parking lot to be striped?
Yes. Nampa city code, title 10 chapter 22, requires that parking spaces in the city be striped, and includes repair of parking and drive aisle surfaces in required maintenance.
How many accessible parking spaces does my lot need?
It comes from ADA Table 208.2 and scales with your total count. One space for a lot up to 25, two up to 50, three up to 75, four up to 100. One in every six required accessible spaces has to be van accessible.
Are accessible parking rules different in Nampa than in Meridian?
No. Idaho Code 39-4116 does not allow a city to amend any accessibility provision, so the requirements are identical across Idaho.
Should we sealcoat before striping?
If the lot needs both, yes, and in that order. The sealcoat has to cure fully first, usually twenty four to forty eight hours depending on temperature, and then the striping goes down on a clean surface.
Can you number the stalls in an apartment complex?
Yes, and we do a lot of it. Numbering is priced per character and it is what makes assigned parking enforceable.
Request a site walk
We will come out, count what is on the lot, and tell you what it needs before anyone talks about a number.